Damp Coat

Features

Ease of Application
Brush/Roller/Spray

Potable Water Safe

Multi Surface Application

Water Pressure Resistance
How to apply

Step 1
Remove efflorescence, existing painting system and reach the plaster/brick surface. Repair & clean the surface.

Step 2
Add water to liquid (1 Ltr damp coat add 20% of fresh water) and mix well.

Step 3
Apply 2 coats of damp coat recommended coverage on saturated dry surface. Keep a gap of 6-8 hours between each coat.

Step 4
Apply plaster/putty and continue normal painting process using Ujala paints.